Walkerton, Canada‐ Production Facility

SPECIAL NOTE:
All contractors are expected to provide their own PPE, this includes but is not limited to individuals performing electrical work such as calibration and troubleshooting.  

Contact Dawn Burnett at 519‐881‐5243 with questions related to the Walkerton facility contractor program

The Service Manager or other accountable person for your company will need to: 
 
Pre-Qualification Questionnaire *

  1. Print‐out and fill‐in information, fax the completed forms to the attention of ECR at 519‐881‐5298 (include attachments for item C and D on the form).
  2. Required to be submitted annually.

CSCP - Contractor Safety Compliance Program *

  1. Review the contents of this document with each contract and subcontract employee that will visit our facility to perform services / repairs and calibrations.
  2. Print-out the last page, sign (clearly print name below signature) and fax to the attention of ECR at 519‐ 881‐5298
  3. Required to be reviewed and submitted annually.

Contract Company 'CSCP checklist' *

Print‐out and fill‐in per the instructions and fax to the attention of ECR at 519‐881‐5298.

 

Contractor and ECR Safety Review

  1. Review the contents of this document with each contract and subcontract employee that will visit our facility to perform services / repairs and calibrations.
  2. This form has been provided for reference only.  A review with the contractor and the Energizer Contractor Representative (ECR) will take place at the Energizer facility.
  3. Required to be reviewed and submitted annually. 

Walkerton - House Rules

  1. Review contents with each employee, contract and subcontract employee, that will visit our facility to perform services / repairs / calibrations, etc.
  2. Required to be reviewed annually. 

Walkerton - Site Orientation

Please have each member of your company that will perform work or a service at our facility view this Site Orientation. 

 

* Needs to be submitted only once (annually) by the service manager